Honeywell Cold Aisle Project

Release time: 2025-02-07

Project Background:
Clients Requirements: The Honeywell has the demand of Cold Aisle. The project is to provide 1 set of MDC in order to reconfigure their IT room.

Project Summary:
Equipped with 1sets of 14- Racks double-row modular data center systems, the size of the cabinets used is 800mm×1100mm×2000mm (W×D×H), including 14 network cabinets, 2*25kw in-row air conditioners, and external 1 modular UPS system, 1 precision power distribution cabinets, and a dynamic ring system, the configuration consider N+1 Solution here.


Go Back

Recommended articles

WhatsApp

Leave a message!

Leave a message!

请在浏览器中启用 JavaScript 来完成此表单。